![]() ![]() The dealer must retain a copy of the document in sales record files. The consumer/purchaser is to sign and be given a copy of the letter Manufactured Home Owner Completing Installation. The notice must be signed and dated by purchaser and purchaser must be provided a copy of the document.įor all new and used manufactured home sales when the home or portions of installation or re-installation are to be completed by the owner. If the home is currently installed for occupancy in a park or located on private property and is not being relocated, a notice of sale is not required.įor new manufactured home sales, licensed dealers must complete and retain in dealer sales record files the Important Notice/Purchaser Disclosure. ![]() Submit a Notice of Manufactured Home Sale and Installation for all new and used manufactured home sales when the home is to be installed or re-installed. NOTE: Paper applications will not be processed after Oct. Serial number, model name/number, and date of manufacture of home (photocopy of title). "R" or "U" values of home when originally constructed (data plate). Plot plan including location on property, property lines, easements, and setbacks.ĭimensioned floor plan of existing home and proposed alteration or addition. Window schedule indicating and verifying compliance for light (8 percent), vent (4 percent), and egress. Method for extension of appliance flues and plumbing vents through roof if roof changes are proposed. Procedure for installation of materials fastener type and spacing.Įngineering designs/calculations for trusses, window/door headers, and frame ground support. Include span ratings, grade and species, installation instructions, fire ratings, and etc. Types of materials and their specifications. View instructions about how to create an account and link to your business license number (if applicable).įor municipalities that enforce the Minnesota Building Code, visit Local Code Lookup for information to contact your jurisdiction.ĭepending on the alteration, required information may include: Contractors must link to their license before obtaining permits. Users must create a new account to obtain and pay fees. Note: A new online system launched June 22, 2020. Submit a permit application for manufactured home alteration. Once your plan has been approved, you need to find a certified building official to perform the inspections. New online permit systemįor municipalities without an appointed building official, you need to create an account in our new plan review and permit system. Alterations to electrical systems or components require application for permit and inspection by a Minnesota electrical inspector. Prior to beginning an alteration to a manufactured home, documentation for the proposed alteration must be submitted for review to this agency or the local authority having jurisdiction. For more information, view Minnesota Building Code Rules Chapter 1350.įor municipalities without an appointed building official, visit License and Registration Lookup to find a certified building official.įor municipalities that enforce the Minnesota Building Code, visit the Local Code Lookup to display your jurisdiction's contact information. ![]() All new manufactured homes installed in Minnesota for occupancy are required to be inspected according to the Federal Installation Standards Programs, Code of Federal Regulations (CFR) 3285 and 3286.
0 Comments
Leave a Reply. |
Details
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |